REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 14L: Lock Mandrels and Landing Nipples : Reaffirmed

$

273

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 20F: Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries : Reaffirmed

$

169

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 5NCL Nickel Content Limits for API 5CT Sour Service Products

$

149

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 19ICD: Inflow Control Devices : Reaffirmed

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 23.2: Reconciliation of Liquid Tank Car(s) Quantities : Reaffirmed

$

218

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16A: Specification for Drill-through Equipment

$

322

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids wA1

$

388

BUY NOW

API RP 16ST

API RP 16ST: Addenda 1

CDN $0.00

SKU: 4d5f6c811b78 Category:

Description

This Recommended Practice (RP) addresses coiled tubing well control equipment assembly and operation as it relates to well control practices. Industry practices for performing well control operations using fluids for hydrostatic pressure balance are not addressed in this RP. This document covers well control equipment assembly and operations used in coiled tubing intervention and coiled tubing drilling/milling applications performed through: — tree equipment constructed in accordance with API 6A or API 11IW or both, — a surface flow head or surface test tree constructed in accordance with API 6A, — a fracture stimulation wellhead assembly (with at least two gate valves installed for isolation), — drill pipe or workstrings with connections manufactured in accordance with API 5CT, API 5DP or API 7-1, or a combination thereof.

Edition

2

Published Date

2022-02-04

Status

Current

Pages

2

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This Recommended Practice (RP) addresses coiled tubing well control equipment assembly and operation as it relates to well control practices. Industry practices for performing well control operations using fluids for hydrostatic pressure balance are not addressed in this RP. This document covers well control equipment assembly and operations used in coiled tubing intervention and coiled tubing drilling/milling applications performed through: — tree equipment constructed in accordance with API 6A or API 11IW or both, — a surface flow head or surface test tree constructed in accordance with API 6A, — a fracture stimulation wellhead assembly (with at least two gate valves installed for isolation), — drill pipe or workstrings with connections manufactured in accordance with API 5CT, API 5DP or API 7-1, or a combination thereof.

Previous Editions

Can’t find what you are looking for?

Please contact us at: