REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 14L: Lock Mandrels and Landing Nipples : Reaffirmed

$

273

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 20F: Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries : Reaffirmed

$

169

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 5NCL Nickel Content Limits for API 5CT Sour Service Products

$

149

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 19ICD: Inflow Control Devices : Reaffirmed

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 23.2: Reconciliation of Liquid Tank Car(s) Quantities : Reaffirmed

$

218

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16A: Specification for Drill-through Equipment

$

322

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids wA1

$

388

BUY NOW

ISO 4917:2024

ISO 4917:2024 Design of nuclear power plants against seismic events – Part 6: Post-seismic measures

CDN $115.00

Description

This document applies to nuclear power plants with water cooled reactors.

This document does not apply to earthquakes stronger than the design basis earthquake.

This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.

Edition

1

Published Date

2024-02-27

Status

PUBLISHED

Pages

12

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document applies to nuclear power plants with water cooled reactors.

This document does not apply to earthquakes stronger than the design basis earthquake.

This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.