REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 14L: Lock Mandrels and Landing Nipples : Reaffirmed

$

273

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 20F: Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries : Reaffirmed

$

169

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 5NCL Nickel Content Limits for API 5CT Sour Service Products

$

149

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 19ICD: Inflow Control Devices : Reaffirmed

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 23.2: Reconciliation of Liquid Tank Car(s) Quantities : Reaffirmed

$

218

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16A: Specification for Drill-through Equipment

$

322

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids wA1

$

388

BUY NOW

API RP 17G5

API RP 17G5: Subsea Intervention Workover Control Systems

CDN $163.61

SKU: c11feccd0e61 Category:

Description

This document provides the requirements for the design, manufacture, and testing of intervention workover control system (IWOCS) equipment typically used in a thru-blowout preventer intervention riser system and an open-water intervention riser system. Some requirements in this document are specific to the execution of end user–defined safety functions. This document defines “safety class control functions” used to operate safety class devices. This document provides guidance on the determination of safety class control functions based on the end user–provided safety functions. Blowout prevention (BOP) control systems are outside the scope of this Recommended Practice and typically are not connected to the IWOCS.

Edition

1

Published Date

2019-11-22

Status

Current

Pages

42

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides the requirements for the design, manufacture, and testing of intervention workover control system (IWOCS) equipment typically used in a thru-blowout preventer intervention riser system and an open-water intervention riser system. Some requirements in this document are specific to the execution of end user–defined safety functions. This document defines “safety class control functions” used to operate safety class devices. This document provides guidance on the determination of safety class control functions based on the end user–provided safety functions. Blowout prevention (BOP) control systems are outside the scope of this Recommended Practice and typically are not connected to the IWOCS.

Previous Editions

Can’t find what you are looking for?

Please contact us at: