Your cart is currently empty!

Description
This recommended practice, API RP 581 Risk-Based Inspection Methodology, provides quantitative procedures to establish an inspection program using risk-based methods for pressurized fixed equipment including pressure vessel, piping, tankage, pressure relief devices (PRDs), and heat exchanger tube bundles. API RP 580 Risk-Based Inspection provides guidance for developing Risk-Based Inspection (RBI) programs on fixed equipment in refining, petrochemical, chemical process plants and oil and gas production facilities. The intent is for API RP 580 to introduce the principles and present minimum general guidelines for RBI while this recommended practice provides quantitative calculation methods to determine an inspection plan. The calculation of risk outlined in API RP 581 involves the determination of a probability of failure (POF) combined with the consequence of failure (COF). Failure is defined as a loss of containment from the pressure boundary resulting in leakage to the atmosphere or
Edition
3
Published Date
2019-04-05
Status
Current
Pages
3
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment

Abstract
This recommended practice, API RP 581 Risk-Based Inspection Methodology, provides quantitative procedures to establish an inspection program using risk-based methods for pressurized fixed equipment including pressure vessel, piping, tankage, pressure relief devices (PRDs), and heat exchanger tube bundles. API RP 580 Risk-Based Inspection provides guidance for developing Risk-Based Inspection (RBI) programs on fixed equipment in refining, petrochemical, chemical process plants and oil and gas production facilities. The intent is for API RP 580 to introduce the principles and present minimum general guidelines for RBI while this recommended practice provides quantitative calculation methods to determine an inspection plan. The calculation of risk outlined in API RP 581 involves the determination of a probability of failure (POF) combined with the consequence of failure (COF). Failure is defined as a loss of containment from the pressure boundary resulting in leakage to the atmosphere or
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-
API STD 12R1: Installation, Operation, Maintenance, Inspection, and Repair of Tanks in Production Se
0 out of 5CDN $297.17 Add to cart -
API RP 2009: Safe Welding, Cutting and Hot Work Practices in the Petroleum and Petrochemical Industr
0 out of 5CDN $188.65 Add to cart -
API RP 2207: Preparing Tank Bottoms for Hot Work
0 out of 5CDN $218.70 Add to cart -
API SPEC 12D: Specification for Field Welded Tanks for Storage of Production Liquids
0 out of 5CDN $207.02 Add to cart