Your cart is currently empty!

API TR 654
API TR 654: Aboveground Storage Tank Caulking or Sealing the Bottom Edge Projection to the Foundatio
CDN $218.70
Description
This technical report provides guidance to owner operators that have tanks that are set on a foundation system with the goal to protect the asset from deterioration by minimizing corrosion and foundation deterioration and allowing for proper support of the tank shell. The asset includes the tank itself as well as the foundation system. This technical report does not require that caulking or sealants be installed at the bottom edge projection and the foundation of aboveground storage tanks. It provides guidance in situations in which caulking or sealants may be advantageous and should be considered. This technical report applies to situations where an owner/operator is considering caulk or sealant in this area, or if any regulatory agency requires or recommends that an owner/operator installs some type of caulk or sealant. This document will also consider how to inspect existing caulk and sealant, including maintenance procedures, and includes a suggested inspection schedule.
Edition
1
Published Date
2019-05-01
Status
Current
Pages
23
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment

Abstract
This technical report provides guidance to owner operators that have tanks that are set on a foundation system with the goal to protect the asset from deterioration by minimizing corrosion and foundation deterioration and allowing for proper support of the tank shell. The asset includes the tank itself as well as the foundation system. This technical report does not require that caulking or sealants be installed at the bottom edge projection and the foundation of aboveground storage tanks. It provides guidance in situations in which caulking or sealants may be advantageous and should be considered. This technical report applies to situations where an owner/operator is considering caulk or sealant in this area, or if any regulatory agency requires or recommends that an owner/operator installs some type of caulk or sealant. This document will also consider how to inspect existing caulk and sealant, including maintenance procedures, and includes a suggested inspection schedule.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-
API RP 505: Recommended Practice for Classification of Locations for Electrical Installations at Pet
0 out of 5CDN $435.74 Add to cart -
API RP 2003: Protection Against Ignitions Arising Out of Static, Lightning, and Stray Currents
0 out of 5CDN $370.63 Add to cart -
API STD 2610: Design, Construction, Operation, Maintenance and Inspection of Terminal and Tank Facil
0 out of 5CDN $347.26 Add to cart -
API RP 2028: Flame Arresters in Piping Systems
0 out of 5CDN $116.87 Add to cart