REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 14L: Lock Mandrels and Landing Nipples : Reaffirmed

$

273

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 20F: Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries : Reaffirmed

$

169

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 5NCL Nickel Content Limits for API 5CT Sour Service Products

$

149

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 19ICD: Inflow Control Devices : Reaffirmed

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 23.2: Reconciliation of Liquid Tank Car(s) Quantities : Reaffirmed

$

218

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16A: Specification for Drill-through Equipment

$

322

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids wA1

$

388

BUY NOW

API RP 1172

API RP 1172: Construction Parallel to Existing Underground Transmission Pipelines

CDN $166.95

This publication was last reviewed and confirmed in 2020.

SKU: 3856a2f18d1d Category:

Description

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Edition

1

Published Date

2014-04-29

Status

Reaffirmed

Pages

30

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Previous Editions

Can’t find what you are looking for?

Please contact us at: