Your cart is currently empty!

API RP 1172
API RP 1172: Construction Parallel to Existing Underground Transmission Pipelines
CDN $166.95
This publication was last reviewed and confirmed in 2020.
Description
The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.
Edition
1
Published Date
2014-04-29
Status
Reaffirmed
Pages
30
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment

Abstract
The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-
API RP 1111: Recommended Practice for the Design, Construction, Operation, and Maintenance of Offsho
0 out of 5CDN $273.80 Add to cart -
API STD 1163: In-line Inspection Systems Qualification
0 out of 5CDN $255.43 Add to cart -
API RP 1176: Errata 1
0 out of 5CDN $0.00 Add to cart -
API STD 1164: Pipeline Control Systems Cybersecurity
0 out of 5CDN $355.60 Add to cart